Title: One more sprint?

Author: Keqiang Zhang, Emily Gu, Cynthia Zhang

[this blog is summarized from the conversation about “Agilediscussion”]

?

Problem

One project use scrum to do their job in a big company. After 5 sprints, one more sprint is required by development team. the team said: at the beginning, the requirements are not clear, the scope is not changed, just refined. But the project original schedule and budget are considered as 5 sprints, and the business side will not agree neither increasing money or cutting scope.

?

Analysis is conducted by some people.

?

A:estimation and capability

Normally, this is common problem when the team starts to implementAgile. This involves learning curve. Normally the business part will push hardthat they should keep the same pace as traditional way of development.

??

This means they need to know their capability/velocity. Coachingon the estimation, sprint planning is needed. After two sprints, it should beok.

But how could it be possible to know it's over budget anddeliver later after 5 sprint? it may be a long term estimation and monitorproblem.

?

B:long term estimation and overall progress monitor

After using Scrum, the projects in ABC(another company) lost thecapability of long term estimation

Agile say: deliver the value as early as possible, but Agiledon’t emphasize: what is a whole solution? when to complete?

In Scrum, the product backlog are open to change.

?

Two practice are suitable for adding long term visibility inScrum

1, release plan

2, burn-down chart of whole lifecycle, not only for dailytracking in sprint, one iteration as one dot in burn-down chart.

?

So the long term estimation is monitored. Then the necessarychange could be taken.

To add more iteration/sprint is OK, but it should be monitoredand reasonable.

?

?

But how could it be possible to know it's over budget anddeliver later after 5 sprint? (2 weeks per sprint?)

?

?

C:commitment

development team said "OK. We can not finish, so we needanother sprint".

it seems that the team didn't respect their commitment.

?

C1:Commitment is different in different culture.

In CMMI, Commitment need be tracked and managed.

That is to say, commitment could be changed. So as I think,commitment in English is not same as Chinese culture. ??

So Commitment in agile could also be changed in English.??

But in China, somebody use the commitment in Chinese culture.

They use commitment to push/force the team finish the plannedwork, even? over time. ??

Anyway, Commitment is so ambiguous.??

?

C2:Personally I don’t fully agree with a few C1's opinions.Commitment in Chinese culture means no changes?

For me, the commitment is same everywhere. No matter it’s inCMMI or in Agile. Probably it changes a bit in different company culture. Likeovertime is pushed. But this isnt’ Agile way.

In Agile, it mainly talks about team, people are committed. Theteam can plan the project roadmap or release plan realistically once they knowtheir velocity. Only in Agile, the commitment is clearer in the short durationlike one or two sprint. The team can deliver the most important features asearly as possible.

The commitment is the features delivered. In waterfall model, itdoesn't mean you cannot over budget and deliver late.

?

D:Fixed budge and time

Normally in Agile, the scope should be flexible. Agile want toselect the most valuable and prioritized features

Agile bring more observation chances in every iteration, soAgile could make the requirements more clear and more attractive.

This is what I think the biggest difference with Waterfall.

??

But for budge, time and scope, it belongs to businessenvironment.

Some Agile consultants/implementer prefer to adjust the businessenvironment to do agile transformation.

I prefer to do agile improvement according to the businessenvironment. ??

Even the budge, time and scope are all fixed, Agile can still beimplemented and would be better than the waterfall.

與50位技術(shù)專家面對(duì)面20年技術(shù)見證,附贈(zèng)技術(shù)全景圖

總結(jié)

以上是生活随笔為你收集整理的One more sprint? 再加一个迭代?-英文的全部?jī)?nèi)容,希望文章能夠幫你解決所遇到的問題。

如果覺得生活随笔網(wǎng)站內(nèi)容還不錯(cuò),歡迎將生活随笔推薦給好友。

主站蜘蛛池模板: 日本一区二区免费视频 | a天堂亚洲 | 国产免费看黄 | 免费观看在线播放 | 日韩精品一区在线 | www.久久久精品 | 国产思思99re99在线观看 | 一级黄色在线播放 | 亚洲激情六月 | 婷婷久久亚洲 | 三上悠亚一区二区三区 | 欧美精品99久久 | 人人插人人搞 | 四虎影视成人 | 欧美中字| 成av人片在线观看www | 天堂在线中文在线 | 亚洲国产精品尤物yw在线观看 | 92久久精品一区二区 | 婷婷丁香五 | 你懂得在线 | 手机在线观看日韩av | 米奇影音| 亚洲激情欧美色图 | 黄色一级视频片 | 五月天丁香久久 | 日韩欧美国产一区二区三区在线观看 | 国产xxxxx视频 | 十大黄台在线观看 | 亚洲精品国产精品乱码不66 | www日本色| 国产激情一区二区三区四区 | 亚洲18在线看污www麻豆 | 色欲av无码一区二区三区 | 成人一卡二卡 | 欧美一卡二卡三卡四卡 | 特黄aaaaaaaaa毛片免费视频 | 国产精品伦一区二区三区 | 欧美人与性动交α欧美精品 | 欧美精品v | 日韩视频在线观看一区 | 日本高清不卡在线 | 婷婷色综合 | 一级做a免费视频 | 在线免费黄色 | 免费一级黄色 | 高清乱码免费网 | 欧美一级xxx | 日本美女a级片 | 日本人妻熟妇久久久久久 | 成人毛片100免费观看 | 91视频专区 | 成人免费在线电影 | 日美毛片 | 美女被c出水 | 国产精品女优 | 中文字幕高清一区 | 日本在线不卡一区二区 | 国产91传媒 | 国产激情视频一区二区 | 91免费视| 高潮毛片7777777毛片 | 日本一区二区免费电影 | 欧美人与动物xxx | 免费在线观看亚洲 | 波多野结衣简介 | 亚洲精品一区二三区不卡 | 成人性生交大全免 | 欧美aaaaaaaaa | 黄色小视频在线看 | 超清纯大学生白嫩啪啪 | 国产精品视频99 | 欧美鲁鲁| 91久操| 午夜精品三级久久久有码 | av不卡在线| 亚洲大片免费观看 | www.尤物| 青青在线精品 | 女人下面喷水视频 | 久久一区二区三区精品 | 影音先锋在线视频 | 精品人妻一区二区免费 | 六月婷婷七月丁香 | 视频一区 国产 | 91视频免费在线观看 | 性欧美另类 | 国产精品久久久久久免费免熟 | 超碰香蕉 | 青草99| 免费午夜网站 | 精品一区二区三区四区五区六区 | 国产又粗又猛又爽又黄的视频一 | 日韩av成人 | 色综合色综合 | 亚洲涩网 | 免费毛片网站在线观看 | 嫩草在线观看视频 | 99久久久无码国产精品性黑人 |